Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1265
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P-029-2022-Smt. K. Lalitha, TVM-Order 29-07-2022

Download 
Download

The appellant made an application to the Licensee to change the ownership and another application on 22-10-2020 to reduce the Contract Demand from 250 kVA to 25 kVA. There was an arrear energy charges of Rs.11,96,945/-. The Licensee asked NOC from the previous owner of the building for the transfer of Security Deposit, which has been objected by the previous owner. The Licensee issued a letter to the appellant directing to clear the arrear of energy charges and also to pay fresh Security Deposit. The appellant filed a petition to the CGRF, Southern Region, and CGRF ordered that the petitioner is liable to remit the current charge arrears and required Security Deposit afresh while executing the agreement for transfer of ownership and reduction of Contract Demand. Aggrieved by the decision of CGRF, the appellant filed the appeal petition and the Authority decides as follow: (4) The order of CGRF, Southern Region, Kottarakkara in OP No. 51/2021 dated 28-09-2021 is set aside. (5) The demand notice of Licensee is quashed. (6) The Licensee shall recover the arrears of the energy charges from the security deposit of registered owner of Licensee as per the records. (7) The Contract Demand is deemed to be reduced with effect from 07-11-2020 and the Licensee has to send the revised demand to the appellant. (8) The appellant shall pay the energy charges as per the revised demand of Licensee as a deposit as per Section 40 (3) of Kerala Electricity Supply Code 2014. (9) The appellant is liable to pay the security deposit for transferring the connection and execute fresh agreement.
P-037-2022-Union Match Works, Kottayam-Order 27-07-2022

Download 
Download

Even though the factory was not functioning, it was not in locked condition. But the regular bill for 05/2021 was issued showing the meter reading status door locked. The Licensee has not replaced the faulty meter within the time limit as per regulation. The meter was replaced only on 11-06-2021. The appellant filed a petition before CGRF, Southern Region, and the Forum in its order dated 16.03.2022 ordered to revise the bill for 06/2021 by taking the proportionate average consumption up to the date of replacement of faulty meter, based on this recalculated average of 238 units and the revised bill has been issued. Aggrieved by the decision of the Forum, the appellant filed the appeal petition and this Authority decides as follow: (10) The electricity bills of May 2021 and June 2021 raised by the Licensee is quashed. (11) The bill raised for the month of May 2021 and June 2021 are to be revised by eliminating the energy charges and energy duty for a period from 14-05-2021 to 11-06-2021. (12) The order of CGRF, Southern Region in OP No.72/2021 dated 16-03-2021 is set aside. (13) Licensee has to issue strict instruction to all concerned officials to strictly abide the Regulations applicable from time to time.
P-031-2022-Smt. Mini Felix, Ernakulamn-Order 25-07-2022

Download 
Download

The appellant installed a grid connected solar system on getting the approval from the Licensee by an approved service provider. On 25-10-2021, the Licensee demanded for Rs.3,540/- as connecting charge and the same has been paid and the solar plant identification number was allotted by KSEBL. The application for meter testing & inspection was submitted on 01-11-2021. The testing was done on 15-12-2021 and solar plant was connected to the grid. As per the appellant, there was a delay of 44 days from the date of application and hence, suffered loss of energy. Appellant’s request is to compensate the loss. The appellant filed a petition before CGRF, Central Region and the Forum dismissed the petition. Aggrieved by the decision of the Forum, the appellant filed the appeal petition and this Authority decides as follow. (14) The Licensee has to reimburse the energy charges for 22 days (from 23-11-2021 to 15-12-2021) collected from the appellant. (15) The order of CGRF, Central Region in OP No.74/2021-22 dated 23-03-2022 is set aside.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday4124
mod_vvisit_counterAll5093083