Additional load – request for additional load in a High rise building – P/209/2011 – Mohammed Haji, Kozhikode |
|
The appellant is the owner of a High Rise building having a HT electric connection with a contract demand of 70 KVA. The connection was given after installing a 150 KVA indoor transformer. Seven numbers of other LT connections were also given to the said building (from KSEB T’rfr) on the basis of the applications of the owner/rent holders or occupants prior to HT service with in a total of 50 KVA. While so, the appellant had applied for additional load for a LT connection. Since the total load of all the LT connections so availed in the building including the additional load requested) exceeds 50 KVA, the appellant was asked to install a separate transformer in his building premises, by the KSEB. Hence this dispute. |
Delay in effecting the new electric connection even payment of estimate charges– P/218/2011 – Muralidharan C, Kadalundy |
|
The appellant has applied for a service connection after completing all office formalities and remitting the required fees. The complaint of the consumer is that the licensee has failed to give electric connection to a new applicant as per the “Standard of Performance” prescribed by the Commission ie. within the specified days of registration and remittance of fees. |
Conversion of existing electric connection under HT to LT tariff and reduction in connected load – P/244/2011 – Indian Oil Corporation Ltd, Kochi |
|
The consumer had requested the licensee to convert the HT power connection to LT tariff with a reduced connected load. Later the consumer stopped all their activities in the premises and discontinued paying the electricity charge. The consumer was served with demand notices towards the dues of current charges and interest accrued during the period. Due to failure to remit the bills, the consumer was served with Revenue Recovery notice by Tahasildar (RR). The appellant filed a complaint requesting orders to set aside the impugned assessment dated 15-3-2007 and against the action taken for the revenue recovery. Dispute on the final dues of the consumer. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 509 | |
All | 5366917 |
P/055/2024, Shri.Mujeeb.M |
04-11-2024 |
P/054/2024, Shri.Sunil Kumar |
04-11-2024 |
P0/51/2024, Shri. Joy Joseph |
04-11-2024 |
P/049/2024, Sri. Roy Joseph |
04-11-2024 |
P/052/2024, Shri. Sunil Thomas |
04-11-2024 |
P/053/2024, Shri. K.M Raveendran |
04-11-2024 |
P/050/2024, Shri.G.Isaac |
04-11-2024 |
P/048/2024, Shri.David Saj Mathew & Smt. Aparna M.Babu |
04-11-2024 |
P/030/2024, Shri. Dr. Biju Ramesh |
03-10-2024 |
P/046/2024, Shri. Biji Sony |
03-10-2024 |