KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Overview | Search Downloads | Submit file | Up |
Download details |
Additional load – request for additional load in a High rise building – P/209/2011 – Mohammed Haji, Kozhikode | ||||||||||||
The appellant is the owner of a High Rise building having a HT electric connection with a contract demand of 70 KVA. The connection was given after installing a 150 KVA indoor transformer. Seven numbers of other LT connections were also given to the said building (from KSEB T’rfr) on the basis of the applications of the owner/rent holders or occupants prior to HT service with in a total of 50 KVA. While so, the appellant had applied for additional load for a LT connection. Since the total load of all the LT connections so availed in the building including the additional load requested) exceeds 50 KVA, the appellant was asked to install a separate transformer in his building premises, by the KSEB. Hence this dispute. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 4495 | |
All | 5514730 |
RP/08/2024, Sri. Sunil Thomas |
04-12-2024 |
P/067/2024, Sri. Arun. C |
04-12-2024 |
P/066/2024, Sri. Shajan . N.P |
04-12-2024 |
P/062/2024, ശ്രീ. മുഹമ്മദ് ഇബ്രാഹിം |
04-12-2024 |
P/061/2024, Sri. Mamathukutty |
04-12-2024 |
P/060/2024, ശ്രീമതി. ചന്ദ്രലേഖ & ശ്രീ .വി.എൻ ശശീന്ദ്രൻ |
04-12-2024 |
P/059/2024, Sri. M. Mohammed Haji |
04-12-2024 |
P/058/2024, Shri.P.N.Krishnadas |
04-12-2024 |
P/057/2024, ശ്രീമതി .നബീസ അമ്പലവൻ |
04-12-2024 |
P/056/2024, ശ്രീമതി. അജിത.കെ.വി |
04-12-2024 |