P/089/2016 Sri. P.V. Mathew, Kottayam.

Download 
Download

The appellant, Sri P.V. Mathew, is a consumer under Electrical Section, Thrikodithanam. The appellant’s case is against the non removal of electric line drawn through his property for providing service connection to three houses. It is alleged that the line was drawn through his property without his knowledge and consent. Against the above action on the part of respondent, the appellant approached the Hon’ble Commission which was disposed of with a direction to file a petition before CGRF. Accordingly, the appellant filed a petition before the CGRF, Kottarakkara and the Forum is of the opinion that further interruption is not required until the disposal of OP filed by the appellant in the Munsiff Court, Changanacherry and the Forum dismissed the petition vide order in OP No. 160/2016 dated 19-10-2016. Feeling aggrieved against the order of CGRF, the appellant has filed the appeal petition before this Authority. In view of the above discussion the appellant is directed to submit an application for shifting the overhead line in the local office of the licensee. The respondent is directed to shift the overhead line passing through the appellant’s property after giving supply to the existing consumers by alternative methods. It is made clear that labour charges required for shifting the overhead line only be recovered from the appellant after giving prior intimation of the estimate. The order of CGRF in OP No. 160/2016 dated 19-10-2016 is set aside. No order as to costs.
P/091/2016 Smt. Reetha A.V., Kozhikode.

Download 
Download

The appellant, Smt. Reetha A.V., is a consumer under Electrical Section, Pottammal, in Kozhikode District. The appellant’s case is against the inaction on the part of respondent to disconnect the underground cable drawn through her plot without consent. The cable was provided by the nearby consumers namely Sri Yugesh and Smt. Nisha having consumer numbers 5417 and 16630 respectively for pumping water for their own use from the well situated in the appellant’s plot. It is also alleged that due to the drawing of cable through her property, the appellant finds difficulty to dispose of her property. Though the appellant had approached the respondent for removing the cable drawn through her property, the respondent had not taken any action. So, the appellant filed petition before higher authorities of the licensee, but they also failed to take any action. Hence the appellant filed a petition before the CGRF, Kozhikode. But the Forum dismissed the petition vide order in OP No. 108/2016‐17 dated 09-02-2016 directing the respondents to ensure safety aspects and the appellant to approach competent Forum for redressing the grievance. Feeling aggrieved by the order of the Forum, the appellant has filed this appeal petition, before this Authority. The crux of the matter is that the dispute is between close relatives regarding the right to take water from the well. In this factual background, if at all the appellant has any grievance with respect to the sharing of water from common well using electricity for pumping water that can be resolved by resorting to appropriate civil remedies if they are advised so. This Authority is not empowered with jurisdiction to take any decision with respect to the relief sought for by the appellant in the appeal. In view of the above discussions, the appeal petition is dismissed as devoid of any merits. The order of CGRF in OP No 108/2016-17 dated 09-12-2016 is upheld. No order as to costs.
P/086/2016 Sri. E.V. Paul, Thrissur.

Download 
Download

The appellant is a consumer with consumer No. 10123 under Electricity Department, Thrissur Corporation, with a connected load of 6 kW. It is alleged that the appellant has connected unauthorized additional load (UAL) of 24 kW, to licensee’s system. So, the respondent, Assistant Engineer issued a short assessment bill for Rs. 1,20,240.00 for the billing period from 12/2011 to 04/2016. Aggrieved by the said bill, the appellant filed a petition before the CGRF, Thrissur Corporation which was disposed of directing the licensee to charge the appellant for the additional load with effect from 12/2011. Not satisfied with the decision of CGRF, the appellant has filed this appeal petition. In view of the above facts, it is decided to quash the short assessment bill issued to the appellant for an amount of Rs. 1,20,240.00. It is made clear that the respondent is at liberty to revise claim for the unauthorized additional load for the period from 02-02-2015 to the date of submission of application for regularizing the additional load. The order No CGRF/TCED/72 dated 21-10-2016 of CGRF, Electricity Department, Thrissur Corporation is hereby set aside. No order as to costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday114
mod_vvisit_counterAll5353556