Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1290
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P-015-2022-Smt. Vasanthakumari Amma.P., Kollam-Order 31-05-2022

Download 
Download

The appellant has paid required cost for the work with regard to obtaining service connection with a support post. The distribution licensee had effected the connection by using PVC weatherproof wire with support pole from the nearby LT post through a narrow path way used by the three consumers including the appellant by avoiding property crossing, since the petitioner failed to produce the consent from the owner of nearby property. The appellant filed a request to refund the amount paid by him as ECSC for providing service connection using support post, since casuarina wood log was used for giving the new service connection instead of a WP support post was not used for giving the service connection. After the completion of the construction works, the appellant filed a petition before CGRF, Southern Region, for getting the refund of the amount paid as a ECSC for providing WP support post and the Forum in its order dated 03-02-2022 rejected the petition. Aggrieved by the decision of the Forum, the appellant filed the appeal petition. 1. The Order of CGRF, Kottarakkara dated 03.02. 2022 in OP No.63/20211 is quashed. 2. The new support post erected for effecting service connection shall be dismantled & removed at the licensee's cost and KSEB Ltd. shall effect supply from the existing post by making use of a suitable side cross arm for maintaining safety and avoiding property crossing. 3. Th e consumer shall bare the cost of the cross arm as necessitated by KSEB Ltd for effecting the supply. 4. The amount collected by KSEB Ltd for the erecting the new support post shall be adjusted towards the cost of the required cross arm and the balance shall be refunded to the consumer.
P-017-2022- Sri. Sunil Joseph, Ernakulamn-Order 31-05-2022

Download 
Download

The appellant stated that he had got exorbitant bimonthly bills during December 2018 and March 2019. So parallel meter was installed to check the consumption. The wiring and connected load were checked with the help of an electrician and no abnormality and leakage were detected. The appellant also stated that there is no change of production up keeping and sale of plants are around uniform scale for the last 10 years. The appellant had approached the CGRF in the matter and the forum after considering the matter had issued the Order dated 25.05.2020, wherein it was ordered that the consumer meter shall be tested at a NABL accredited laboratory to check the accuracy of the meter within prescribed time. It was also ordered that the bills shall be recalculated as per the test report of the meter. The meter was tested and proved not to conforming to required standards. Accordingly, the bills were revised and the meter was replaced. Subsequently, the appellant further approached KSEB Ltd alleging exorbitant consumption and requested to test the accuracy of the meter again. Accordingly, a parallel meter was installed in the premise and was found that the consumptions recorded by both meters are same. Since the appellant was further insisting on testing of the said energy meter, the same was taken for testing. The meter was tested at Meter Testing Laboratory and found that the same was conforming to standards. The appellant again approached the CGRF, and the Forum in the Order dated 03.03.2022 directed that the appellant is bound to pay the bill issued by KSEB Ltd. The appellant has approached the State Electricity Ombudsman for conducting proper enquiry in the matter. a. The appellant is running a Nursery engaging Horticulture Farming and there is no sales in the premises of the appellant. b. There are people/staff staying in the building where the supply point is existing. c. The respondent KSEB Ltd has complied with the orders of the Consumer Grievance Redressal Forum. d. The Meters have been tested in NABL accredited laboratory of KSEB Ltd as requested by the appellant and the meters are conforming to the required standards. e. The consumption is very low during rainy season and gradually increases and attains maximum during summer, which conforms to the usage of pumps for watering the plants in nursery. It is decided that the appellant is liable to pay the charges as the bills issued are for the energy consumed. The appellant may approach KSEB Ltd. for availing instalment system for paying the pending bills. The appellant may also approach KSEB Ltd. with all relevant documents for applying for change in tariff category based on the purpose.
P-014-2022- Principal, Aircond Computers, Kozhikode-Order 31-05-2022

Download 
Download

As per the guidelines in the circular No. LAI/5243/2009/2005 dated 29/02/2020 issued by Kerala State Electricity Board Ltd. to recover the arrears of current charge being the difference of tariff applicable to SFEI and the bill amount paid by the self-financial educational institutions under different tariff (tariff applicable for government/aided educational institutions) with interest, Electrical Section, Vatakara North issued a tariff revision arrear bill for Rs.1,16,531/-(Rs.41,280/- being the principal and Rs.75,251/- surcharge ) which the appellant is bound to remit as per the notification issued by Kerala State Electricity Regulatory Commission in respect of the tariff of Self Financial Educational Institutions. The hearing of the case was scheduled on 26-05-2022, but the appellant vide letter dated 18-05-2022 expressed his willingness to remit the arrear under One Time Settlement scheme and also submitted a letter, requesting to withdraw that complaint. By considering the willingness of the appellant, Deputy Chief Engineer Electrical Circle, Vadakara accorded sanction to remit the arrear in 6 equal instalments with a surcharge portion at a reduced rate of interest of 4% as intimated by the respondent vide their letter dated 25-05-2022. With the request of both the appellant and the respondent to dispose the complaint submitted by the appellant, the Appeal Petition No. P-014/2022 filed by the appellant is disposed of as withdrawn.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday4885
mod_vvisit_counterAll5515120