Consumer’s meter faulty - dispute in the accuracy of the meter after replacement – P185/2011 - M. Mohammed Basheer, Alappuzha

Download 
Download

The faulty electric meter of the consumer was replaced. Thereafter the meter recorded high consumption which resulted an exorbitant bill. The consumer, under LT IA tariff, aggrieved by the exorbitant bill raised dispute in the accuracy of the meter.
Additional load, reduced load and new service connection – P174/2010 - SaheerE.N. - Tvpm

Download 
Download

Applications for enhancement of connected load on one connection and reduction in connected load on another connection and for a fresh electric connection were submitted by the consumer on 18/1/2010. Reliefs sought are to approve and allow enhanced/reduced load and to effect new service connection applied and pay penalty as envisaged under Standard of Performance Regulations for delay.
Industrial connection taken on M.G. Basis. The consumer discontinued before the MG period-Final dues. P/252/2011-K Kalesh, Pathanapuram.

Download 
Download

Availed an industrial connection on MG basis, but stopped the working of the unit before the completion of Guaranteed period. Electricity arrears were not cleared. R R Action initiated against the consumer. Dispute over the calculation of final dues with out ascertaining the self remuneration status of the Line constructed as per MG Agreement.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1415
mod_vvisit_counterAll5367823