P-037-2022-Union Match Works, Kottayam-Order 27-07-2022
Even though the factory was not functioning, it was not in locked condition. But the regular bill for 05/2021 was issued showing the meter reading status door locked. The Licensee has not replaced the faulty meter within the time limit as per regulation. The meter was replaced only on 11-06-2021. The appellant filed a petition before CGRF, Southern Region, and the Forum in its order dated 16.03.2022 ordered to revise the bill for 06/2021 by taking the proportionate average consumption up to the date of replacement of faulty meter, based on this recalculated average of 238 units and the revised bill has been issued. Aggrieved by the decision of the Forum, the appellant filed the appeal petition and this Authority decides as follow: (10) The electricity bills of May 2021 and June 2021 raised by the Licensee is quashed. (11) The bill raised for the month of May 2021 and June 2021 are to be revised by eliminating the energy charges and energy duty for a period from 14-05-2021 to 11-06-2021. (12) The order of CGRF, Southern Region in OP No.72/2021 dated 16-03-2021 is set aside. (13) Licensee has to issue strict instruction to all concerned officials to strictly abide the Regulations applicable from time to time.

Data

Size 151.43 KB
Downloads 580
Created 2022-08-24 11:16:04

Download

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday6813
mod_vvisit_counterAll5517048