Category: Orders | ||
Orders | Files: 1280 | |
Orders of Kerala Electricity Ombudsman in pdf format |
P/92/2017- Sri. Anu Binod |
|
The appellant is running an industrial unit in the name and style “Ashish Polymer Product” in the premises. The APTS Unit of Kottayam conducted an inspection in the premises on 26-12-2016 along with Sub Engineer of Electrical Section, Ayarkunnam and found that the energy used in one phase (out of 3 phases) was not recording in the meter. decided to quash the short assessment bill amounting to Rs. 1,58,910/- issued to the appellant. The respondent is directed to revise the bill for the unrecorded portion of 37.18% on actual consumption to be recorded for the period from 04/2016 to 11/2016 and issue the revised bill to the consumer within fifteen days |
P/093/2017-Sri Dr. S.K. Madhavan |
|
The appellant was LT VI B tariff instead of the eligible tariff of LT VII A. The appellant had been enjoying the tariff, which is eligible to private hospitals. the appellant’s premises is not eligible for LT VI B tariff. As this a case of incorrect application of tariff, the amount of electricity short collected shall be realized from the appellant by limiting a maximum period of 24 months, without interest |
P/098/2017 -Sri. Sivaraman Surendran |
|
The appellant has requested to shift the transformer from the present position, as the said transformer is a major obstacle to enter his landed property of four cents purchased from the adjacent property owner Smt. Sudharma. The respondent has taken action to shift the transformer to northern or southern side of Smt. Sudharma’s property. She objected the shifting of transformer stating that it will cause inconveniences to the proposed shop rooms to be constructed in her property. the Hearing that it is possible to shift the transformer on the road by taking equal distance of 1.5 m from the common boundary of the property owned by both parties, with least inconvenience. But Smt Sudharma has filed an OS No. 213/2017 before the Hon’ble Munsiff Court, Varkala against KSEBL authorities |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 1882 | |
All | 5351307 |
P/055/2024, Shri.Mujeeb.M |
04-11-2024 |
P/054/2024, Shri.Sunil Kumar |
04-11-2024 |
P0/51/2024, Shri. Joy Joseph |
04-11-2024 |
P/049/2024, Sri. Roy Joseph |
04-11-2024 |
P/052/2024, Shri. Sunil Thomas |
04-11-2024 |
P/053/2024, Shri. K.M Raveendran |
04-11-2024 |
P/050/2024, Shri.G.Isaac |
04-11-2024 |
P/048/2024, Shri.David Saj Mathew & Smt. Aparna M.Babu |
04-11-2024 |
P/030/2024, Shri. Dr. Biju Ramesh |
03-10-2024 |
P/046/2024, Shri. Biji Sony |
03-10-2024 |