KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Overview | Search Downloads | Submit file | Up |
Category: Orders | ||
Orders | Files: 1280 | |
Orders of Kerala Electricity Ombudsman in pdf format |
The LT consumer under TOD meter scheme, with both Contract Demand and Connected load of 116 KVA each, wants to enhance his C/L to 226 KVA keeping the same CD. Dispute-P-307-2012-Sreelakshmy Polymers |
|
The LT consumer was allowed to enjoy 116 KVA as his Contract Demand (CD) and also his connected load (C/L) under TOD meter scheme. The consumer requested to increase his C/L to 226 KVA keeping his CD as the original value itself. The feeding Transformer was rated 160 KVA and it feeds other consumers also. Hence the KSEB wanted the consumer to pay amount to increase the capacity of the T’rfr to cater 226 KVA. But the consumer disputes as he promise to keep within the CD limit. |
Request for double the Bank rate interest for the excess amount paid by the consumer towards the arrear bill issued by the KSEB. P-279/2012- M/s Solve Plasic Products-Punalur. |
|
The AE inspected an industrial unit and found that two CT’s to the Meter are not working and he reassessed the consumer for the back period. The consumer questioned the Bill in the Hon High court and court ordered to deposit certain amount and sent it for Electrical Inspectors adjudication. The EI reduced the bill substantially and so there was excess sum with KSEB. The Hon High Court did not allow interest for the excess amount paid but directed to approach concerned Forum. The consumer wants interest from the date of payment. |
Corrosion and loose connection in one phase of the Meter not recording consumption. Dispute- P-166-2010- Review Petition- Jose Baby- UTC Ice factory-Neendakkara. |
|
The APTS inspection revealed that one phase supply to the meter is not recording correctly. The consumer was issued a bill assessing the energy lost on this account. The appellant contest that the Mahazar prepared is at the office and the Meter was not sent for testing and adjudication by the Electrical Inspector and the 3rd member of CGRF has expressed a different note than that expressed by the others of the CGRF etc. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 4175 | |
All | 5365736 |
P/055/2024, Shri.Mujeeb.M |
04-11-2024 |
P/054/2024, Shri.Sunil Kumar |
04-11-2024 |
P0/51/2024, Shri. Joy Joseph |
04-11-2024 |
P/049/2024, Sri. Roy Joseph |
04-11-2024 |
P/052/2024, Shri. Sunil Thomas |
04-11-2024 |
P/053/2024, Shri. K.M Raveendran |
04-11-2024 |
P/050/2024, Shri.G.Isaac |
04-11-2024 |
P/048/2024, Shri.David Saj Mathew & Smt. Aparna M.Babu |
04-11-2024 |
P/030/2024, Shri. Dr. Biju Ramesh |
03-10-2024 |
P/046/2024, Shri. Biji Sony |
03-10-2024 |