Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1280
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Additional Load - P/047/2014 - Dominic Alexander, Kochi

Download 
Download

The appellant, Sri Dominic Alexander, Lokah Restaurant, 33/2338, Chalikkavattom, Vyttila Bypass, Kochi – 682 019 is a commercial consumer with consumer No. 13218 under Electrical Section, Vennala. An inspection was conducted in the appellant’s premises by the APTS on 26/06/2012 and unauthorised additional load to the tune of 16 kW was detected. Based on the above findings, a short assessment bill for an amount of Rs. 2,31,654/- was issued on 17/12/2012 for the period from 07/2012 to 05/2013. Aggrieved against the bill, the petitioner approached CGRF on 18/01/2014. The CGRF disposed the petition directing the respondent to revise the assessment by limiting the period of assessment to three months from the date of inspection i.e. 26/06/2012, with a direction to regularise the additional load. Also directed to issue fresh bill for the fixed charges for the additional load regularised from 27/09/2012 till the regularisation of the same. Accordingly, the respondent issued revised bill for an amount of Rs. 70,158/- on 13/08/2014. Not satisfied, the appellant filed this petition. The petition is dismissed.
7. Shifting of the electric OH line passing through the complainant’s property – P/356/2013 - Smt. Rajalakshmi, Kollam.

Download 
Download

The complainant has approached the KSEB for shifting the 11 KV line drawn through her property without obtaining her consent. The Board prepared an estimate and demanded to remit the same. Aggrieved by the huge sum demanded and inaction of the KSEB, this dispute originated. Appeal petition is found having merits and is allowed to certain extent.
5. Non-segregation of power and light loads – short assessment bill issued – p/351/2013 – Smt. Laila Sasikumar, Ernakulam.

Download 
Download

The HT industrial consumer was issued short assessment bill being the penal charges for non-segregation of power and light loads in the industry for a certain period. It is held that the extra charges shall be limited to the month of origin of the arrear bill issued by KSEB, since notice has to be served to the consumer.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2505
mod_vvisit_counterAll5364066