KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
![]() |
![]() |
![]() |
![]() |
Download details |
![]() ![]() |
||||||||||||
On 23.03.2017, the Anti Power Theft Squad of Kottayam unit and officials of Electrical Section Meenadam jointly inspected the premises of the appellant and detected that the B-phase meter was not recorded in the CT operated energy meter due to missing of contact consequent to accumulation of rubber dust on one of the CT secondary terminals (B- phase). A site mahazar was prepared, a short assessment bill amounting to Rs. 3,01,177/- was issued for a period from 02/2016 to 03/2017 for the portion of the energy consumed. decide to quash the short assessment bill amounting to Rs. 3,01,177/- issued to the appellant. The respondent is directed to revise the bill for the consumption for the period of 6 months prior to the inspection dated 23-03-2017. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 3528 |
![]() | All | 6452366 |
P/018/2025, Dr, Zachariah Paul |
09-06-2025 |
RP/02/2025, Sri. James Kutty Thomas |
09-06-2025 |
RP/01/2025, Sri. Mohammed Ibrahim.K |
09-06-2025 |
P/026/2025, Sri.N.V.Jose |
09-06-2025 |
P023/2025, Sri.Surendran Chirakkal |
09-06-2025 |
P/016/2025, Smt. Ambily Vasudevan |
09-06-2025 |
P/024/2025, Sri.Jijo.T.A |
09-06-2025 |
P/019/2025, Sri. Vijayan .M |
09-06-2025 |
P/025/2025, Sri.Mohandas.K.K |
09-06-2025 |
P/022/2025, Smt. Mareena George |
09-06-2025 |