KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Overview | Search Downloads | Submit file | Up |
Download details |
Denial to grant power allocation to the applicant’s proposed new industrial firm alleging multiple service in a premise – P/396/2013 – K.P.Johny, Angamaly. | ||||||||||||
The appellant has applied for electric power to his new industrial unit and paid necessary fees for the same. The Asst. Engineer sought clarification from Dy. CE on the maintainability of giving electric connection for a new industry in a place, separated by a wall only, where there existed already 4 numbers of similar LT industrial connections that manufacture the same product, under the same ownership. The respondent declined to grant power as the DCE directed to advice the applicant to take a HT connection combining all units. Disposed the case with direction to respondent to provide the electric connection as applied by the appellant observing the rules in force. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 4880 | |
All | 5562089 |
P/063/2024, Sri. Rajendran .K |
03-01-2025 |
P/064/2024, Sri. Joe.I. Mangaly |
03-01-2025 |
P/082/2024, ശ്രീ.റിയാസ്.ഇ.ആർ |
03-01-2025 |
P/070/2024, ശ്രീ.സ്മിനോജ്.എം.എസ് |
03-01-2025 |
P/069/2024, ശ്രീ.അബ്ദുൾ കരിം സഹറുദ്ദീൻ P.M. |
03-01-2025 |
P/068/2024, ശ്രീമതി.സുകുമാരി.പി |
03-01-2025 |
P/065/2024, ശ്രീമതി. ജോസ്ന കെ.ജെ |
03-01-2025 |
RP/08/2024, Sri. Sunil Thomas |
04-12-2024 |
P/067/2024, Sri. Arun. C |
04-12-2024 |
P/066/2024, Sri. Shajan . N.P |
04-12-2024 |