Industrial connection taken on M.G. Basis. The consumer discontinued before the MG period-Final dues. P/252/2011-K Kalesh, Pathanapuram.
Availed an industrial connection on MG basis, but stopped the working of the unit before the completion of Guaranteed period. Electricity arrears were not cleared. R R Action initiated against the consumer. Dispute over the calculation of final dues with out ascertaining the self remuneration status of the Line constructed as per MG Agreement.