The appellant Shri. Tony Thomas is the Managing Director of Uni Pack (India) Pvt. Ltd. He has availed a HT Service connection for his Industry producing various types of gravels, M-sand etc. under the company named M/s. Unipack(India) Pvt. Ltd. This service connection is under the Electrical Section , Edayar of the Licensee which is under the Electrical Circle Perumbavoor. The appellant was not regular in remitting the current charges. As on 12/05/2025 the total outstanding amount is worked out to Rs. 39,51,044/- including the disputed amount of Rs. 2,47,003/-. The tariff of the consumer is HT 1 (A) with connected load 183.29 KW and contract demand 179 KVA. The consumer filed petition to various fora to delay the payment. The present demand of the petitioner is to quash the bill issued by the Licensee towards disincentive for the power factor correction for Rs.6,12,081/-. This demand notice for the power factor disincentive for a period from 2018-2022, which was in monthly bills. The appellant claimed that he was not aware of the low factor and hence he could not take remedy to improve the power factor. The respondent’s version is that this disincentive was shown in the regular bills. The petitioner filed the petition to CGRF. CGRF issued order dated 25/03/2025 on completing procedure stating that the appellant is liable to pay the arrear and regular bill amount. Aggrieved by the decision of CGRF, this appeal petition is filed to this authority. |
![]() ![]() |
|
പരാതിക്കാരൻ ബദിയടുക്ക ഗ്രാമപഞ്ചായത്ത് സെക്രട്ടറിയായ ഈ കേസ് എണിയാർപ്പ് കുടിവെളള വിതരണ സ്കീമിന്റെ കുടിശ്ശികയെക്കുറിച്ചാണ്. ഉപഭോക്തൃ നമ്പർ 1168187013528 ആയ കണക്ഷൻ ബദിയടുക്ക ഗ്രാമപഞ്ചായത്തിന്റെ കീഴിലുളള കുടിവെളള വിതരണ പദ്ധതിയ്ക്ക് വേണ്ടി നൽകിയിട്ടുളളതാണ്. പഞ്ചായത്ത് നടപ്പിലാക്കിയ ഈ കുടിവെളള പദ്ധതിയ്ക്കുളള കറന്റ് ചാർജ് ഉപഭോക്താക്കളിൽ നിന്ന് പഞ്ചായത്ത് ഈടാക്കി KSEBL ന് അടയ്ക്കുകയാണ് ചെയ്തു വന്നിരുന്നത്. എന്നാൽ ഒരു ഉപഭോക്തൃ സമിതിയുണ്ടാക്കുക്കുകയും 2010 ൽ ഈ പദ്ധതി ആ സമിതിയ്ക്ക് കൈമാറ്റം ചെയ്യുകയും ചെയ്തു. 06/2006 മുതൽ 07/2008 വരെയുളള കാലയളവിൽ യഥാസമയം കറന്റ് ചാർജ് അടയ്ക്കാത്തതിനാൽ 2,62,814 രൂപ കുടിശ്ശികയും അതിന്റെ പലിശ 10,38,076/- രൂപയും ചേർത്ത് 13,00,890/- രൂപ ഇപ്പോൾ കുടിശ്ശികയായി കാണുന്നു. ലൈസൻസി ഇത് ഈടാക്കുന്നതിനു വേണ്ടി പഞ്ചായത്തിന് നോട്ടീസ് നൽകിയതിനെ ചോദ്യം ചെയ്തു പഞ്ചായത്ത് CGRF ൽ പരാതി നൽകുകയുണ്ടായി. CGRF നടപടിക്രമങ്ങൾ പൂർത്തിയാക്കി 01/04/2025 ൽ ഉത്തരവിറക്കി. CGRF ന്റെ ഉത്തരവിൽ മേലുളള അപ്പീലായിട്ടാണ് ഇലക്ട്രിസിറ്റി ഓംബുഡ്സ്മാൻ സമക്ഷം ഈ പരാതി സമർപ്പിച്ചിട്ടുളളത്. |
![]() ![]() |
|
The petitioner Shri. Benny Thomas is the representative of the Owner of the property. The property is owned by Shri. Biju Itty and Smt. Jessy Biju. There is an LT three phase service connection bearing consumer no. 1157495006926 registered in the name of Vincent M.K (Major), Mattappallil, Lakkattoor under LT IV A tariff for an Industrial Manufacturing unit. The property along with industrial unit was sold out by Mr. Vincent and now it is owned by Shri. Biju Itty & Smt. Jessy Biju. Shri. Benny Thomas has taken this premises and the buildings on lease for running an industry which produces the Rubber blocks under the name Aiswarya Rubbers. The LT three phase power availed from the Licensee for the functioning of the industry with connected load 53 KW. This petition is filed by the present owner and represented by Shri. Benny Thomas. On 22/10/2024, the APTs unit of Kottayam along with the officials of the Electrical Section, Kooropada had conducted a surprise inspection of the meter panel and the installation of the said factory. They found that the CT used is with CT ratio 200/5 and then multiplication factor would have been 40. The billing of this consumer was done considering the MF as 20 instead of 40. The meter replacement of this connection was done on 04/01/2019 and the data base would have been corrected after the meter replacement. The MF of the CT also would have been wrongly entered during this time. Then the short assessment bill have been served to the consumer for Rs. 12,48,292/- for a period from 02/2019 to 10/2024 around 5 years and 9 months. The consumer had objected the short assessment bill and filed the petition to CGRF and CGRF issued order dated 29/03/2025 on completing the procedures. Aggrieved by the order of CGRF, this appeal petition is filed to this authority. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
![]() | Today | 1586 |
![]() | All | 6764006 |
P/039/2025, Sri. Biju Itty & Smt. Jessy Biju |
05-08-2025 |
P/038/2025, Sri.P.K Gopinathan |
05-08-2025 |
P/035/2025, Sri.Tony Thomas |
05-08-2025 |
P/037/2025, T.Surendran |
05-08-2025 |
P/034/2025, The President, Lions Club Muvattupuzha |
05-08-2025 |
P/032/2025, The Secretary Badiyadka Grama Panchayath |
05-08-2025 |
P/029/2025, Sri. Vinod.S.Panicker |
05-08-2025 |
RP/03/2025, The Assistant Executive Engineer |
07-07-2025 |
P/028/2025, Smt. Aleyamma Varghese |
07-07-2025 |
P/033/2025, Sri.P.Sasikumar |
07-07-2025 |