KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Overview | Search Downloads | Submit file | Up |
Category: Orders | ||
Orders | Files: 1280 | |
Orders of Kerala Electricity Ombudsman in pdf format |
P/034/2023- M/s Good Buy Soap and Cosmetics(P)Ltd. |
|
Appellant M/s Good Buy Soaps & Cosmetics (P) Ltd. is the consumer of the licensee (KSEB) under the Kanjikode Electrical Section with consumer no. 1165289012972. The connected load is 99.455 kw and contract demand is 95kvA. On inspection of HTMT unit found that the real time clock of the CT meter was defective and thus the meter reading was erroneous. The energy meter was declared faulty. Due to the error in the meter the appellant was under charged during the period Jan/2021 to Aug/2021. A short assessment bill was issued to the appellant for Rs. 2,54,081/- for the said period. The short assessment was calculated taking average of the preceding 6 months for 7/2020 to 12/2020. The appellant filed petition to the CGRF and vide CGRF ORDER dated 12/08/2022, the short assessment bill was quashed and directed the licensee to revise the short assessment as per regulation 125 (1) of Kerala Electricity Supply Code 2014. The licensee filed a review petition and CGRF issued a revised order dated 08/05/2023 stating that the licensee can collect the energy charges for the escaped portion as per regulation 134 of the Supply Code 2014. Aggrieved by the review of order of CGRF, this appeal petition was filed. |
P/0352023- Sri. Biju Kuriakose |
|
The appellant shri Biju Kuriakose is a consumer of the licensee under the tariff LT IA with the consumer number: 11573444011859 under Thiruvaniyoor Section. The consumer installed a Solar Plant of 10kw capacity on 13/12/2018. The connected load of the consumer is 29.35 kw. The solar plant is the grid interactive solar system. The meter has been converted CT/PT connected meter as his connected load exceeded 25kw on 18/12/2020. The zone wise reading of the TOD meter started from 7/2022 onwards. On verification of the zone wise reading, it recorded export of energy in the Zone II and Zone III which shows that there is connection error in CT. Accordingly the sub engineers visited the site and found that the secondary terminals of the CT connected wrongly to the meter. As the polarity was reversed the meter recorded export as import and import as export. The connections were rectified and a mahazzar was prepared. A short assessment bill for Rs. 3, 09,269/- was issued to the appellant. The CGRF was approached and CGRF issued order stating that the appellant is liable to pay the short assessment bill with effect from 18/12/2020. Aggrieved by the decision of CGRF, this appeal petition is filed. |
P/036/2023- Sri. Paul Robson |
|
The appellant Sri. Paul Robson was the registered consumer with number 1155406010243 under college Electrical Section. This connection was in LT IV A tariff. The appellant was not made the power charges since December 2021 as the payment was defaulted the licensee has disconnected the power according to the regulation of Kerala Electricity Supply Code 2014. The licensee could not locate the consumer and hence the notice for the disconnection was not served. The premises was on lease from Mr. Krishnamoorthi and the lease deed signed during 2008 and then the deed was neither renewed nor extended. At present the appellant is not the legal tenant of the premises. The owner submitted application for dismantling the power connection and the licensee has disconnected the power connection. Now the appellant approached the licensee for the reconnection of the power. The section office has asked to produce the legal document showing the occupancy of the premises and the appellant could not produce the same and hence the power was not connected. Aggrieved consumer approached the CGRF and CGRF order dated 23/06/2023 states that the CGRF is not to intervene in the case as the case is pending before the Hon’ble Rent Control Court, EKM. Aggrieved by the decision of CGRF this appeal petition was filed to this authority. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 4026 | |
All | 5370434 |
P/055/2024, Shri.Mujeeb.M |
04-11-2024 |
P/054/2024, Shri.Sunil Kumar |
04-11-2024 |
P0/51/2024, Shri. Joy Joseph |
04-11-2024 |
P/049/2024, Sri. Roy Joseph |
04-11-2024 |
P/052/2024, Shri. Sunil Thomas |
04-11-2024 |
P/053/2024, Shri. K.M Raveendran |
04-11-2024 |
P/050/2024, Shri.G.Isaac |
04-11-2024 |
P/048/2024, Shri.David Saj Mathew & Smt. Aparna M.Babu |
04-11-2024 |
P/030/2024, Shri. Dr. Biju Ramesh |
03-10-2024 |
P/046/2024, Shri. Biji Sony |
03-10-2024 |