Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1265
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/0352023- Sri. Biju Kuriakose

Download 
Download

The appellant shri Biju Kuriakose is a consumer of the licensee under the tariff LT IA with the consumer number: 11573444011859 under Thiruvaniyoor Section. The consumer installed a Solar Plant of 10kw capacity on 13/12/2018. The connected load of the consumer is 29.35 kw. The solar plant is the grid interactive solar system. The meter has been converted CT/PT connected meter as his connected load exceeded 25kw on 18/12/2020. The zone wise reading of the TOD meter started from 7/2022 onwards. On verification of the zone wise reading, it recorded export of energy in the Zone II and Zone III which shows that there is connection error in CT. Accordingly the sub engineers visited the site and found that the secondary terminals of the CT connected wrongly to the meter. As the polarity was reversed the meter recorded export as import and import as export. The connections were rectified and a mahazzar was prepared. A short assessment bill for Rs. 3, 09,269/- was issued to the appellant. The CGRF was approached and CGRF issued order stating that the appellant is liable to pay the short assessment bill with effect from 18/12/2020. Aggrieved by the decision of CGRF, this appeal petition is filed.
P/034/2023- M/s Good Buy Soap and Cosmetics(P)Ltd.

Download 
Download

Appellant M/s Good Buy Soaps & Cosmetics (P) Ltd. is the consumer of the licensee (KSEB) under the Kanjikode Electrical Section with consumer no. 1165289012972. The connected load is 99.455 kw and contract demand is 95kvA. On inspection of HTMT unit found that the real time clock of the CT meter was defective and thus the meter reading was erroneous. The energy meter was declared faulty. Due to the error in the meter the appellant was under charged during the period Jan/2021 to Aug/2021. A short assessment bill was issued to the appellant for Rs. 2,54,081/- for the said period. The short assessment was calculated taking average of the preceding 6 months for 7/2020 to 12/2020. The appellant filed petition to the CGRF and vide CGRF ORDER dated 12/08/2022, the short assessment bill was quashed and directed the licensee to revise the short assessment as per regulation 125 (1) of Kerala Electricity Supply Code 2014. The licensee filed a review petition and CGRF issued a revised order dated 08/05/2023 stating that the licensee can collect the energy charges for the escaped portion as per regulation 134 of the Supply Code 2014. Aggrieved by the review of order of CGRF, this appeal petition was filed.
RP/007/2023- The Assisstant Executive Engineer, Kechery

Download 
Download

The review appellant The Asst. Exe. Engineer, Electrical Sub Division, KSEB, Kechery, Thrissur submitted this review petition to review the order placed by the Ombudsman for the appeal petition No. P/025/2023. The appellant of the original petition p/025/2023 is the owner of the land in Kuttamkulam, Velur village, Kunnamkulam Taluk. The licensee has placed multiple stay wires in this property without the consent of the land owner. The District Collector issued an order stating that the case is not coming under Indian Telegraph Act and KSEB has to resolve the grievance. As the order of CGRF was not the favour of the complainant the appeal petition was filed and Ombudsman issued order on completing the procedural formalities dated 07/07/2023. The review petition was filed to review the order of the Ombudsman.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1232
mod_vvisit_counterAll5088152