Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/112/2017-Sri. Givindraj C & Others

Download 
Download

The appellants approached the CGRF with a petition requesting to shift the double circuit 33 kV electric line passing through their agricultural fields by taking appropriate to shift the line through a feasible route so as to avoid further inconvenience to the appellants. the order of CGRF deserve merit, as the shifting of the line is not technically feasible.reliefs sought by the appellants are also found not admissible the CGRF order in OP No. 03/2017-18 dated 31-07-2017 is upheld Authority.
P/128/2017-Sri. M.C. Suryakumar

Download 
Download

The service connection of the appellant is under LT IVA tariff with a total connected load of 127 KW. While so on 28-03-2008, the APTS of KSEBL conducted an inspection in the premises and found that the energy used in one phase (out of 3 phases) was not recording in the meter. Accordingly, the party was served with a short assessment bill, assessing for 151 days, when the meter was found recording less than the actual, so as to recover the unrecorded portion of energy, for Rs. 48504/-. the respondent is directed to comply the orders of CDRF as per the KSEB norms by revising the bill for 5 months by taking the average of the consumptions for the months from 04/2007 to 09/2007, i.e., consumption prior to the date from which the missing of voltage commenced as per downloaded data.
P/108/2017-Sri. Abraham Mathew

Download 
Download

on 12-01-2017, the APTS of KSEBL conducted an inspection in the premises and found that the energy used in one phase (out of 3 phases) was not recording in the meter. Accordingly, the party was served with a short assessment bill for 12 months, when the meter was found recording less than the actual, so as to recover the unrecorded portion of energy, for Rs. 805101/-. the instant appeal is hereby allowed as indicated above without any order as to cost. The respondent is directed to issue revised bill for a period of 6 months prior to 01/2017 as per Regulation 115(9) of Supply Code, 2014 by taking average of the consumption for the months of 02/2017, 03/2017 and 04/2017 at any rate

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2233
mod_vvisit_counterAll5594648