P-032-2022-Sri. Shymon Anto, Ernakulam-Order 23-08-2022

Download 
Download

On the inspection of APTS, it was found that the voltage in R&B phase was very low and R-phase were current was zero. When measured through the standard test meters, the voltage and current was normal. This shows that the quantities recorded by the meter was very much lower than that of actual. The CTs which are connected to the meter was in the ration 100/5. It is also noticed that one phase was missing from 10-09-2019 to 27-05-2020 and two phases were missing from 28-05-2020 to 14-10-2020. On hearing CGRF-CR issued order dated 27-04-2021 that the bill has to be recalculated by taking into the fraction of actual consumption with recorded consumption, which is 2.788 detected during the inspection. The respondent filed a review petition to CGRF-CR and the Forum issued order dated 21-01-2022 stating that the bill to be recalculated by taking the fraction of actual consumption with recorded consumption (2.78) detected during the site inspection and consider the factor 1.5 to the recorded consumption. As per the order, the amount of short assessment was recalculated as Rs.2,63,876/- and asked the appellant to pay within 30 days. The aggrieved appellant filed the appeal petition before the Authority and takes the following decision: (1) The appellant is liable to pay the short assessment bill calculated as per the order of Consumer Grievance Redressal Forum (Central Region) vide order dated 21-01-2022. (2) The respondent shall allow 24 monthly instalments to the appellant for remitting the payment.
P-034-2022- Smt. Chandrika Kumar, Thrissur- Order 22-08-2022

Download 
Download

As per the appellant, there is a post in front of Syam Complex in the highway itself, which was very close to the building. Instead of taking service connection from the nearby post, the officials of the Licensee inserted an additional post in the property of the Syam Complex and service connection to the complex was taken from the new post. This modification was done without the consent of the appellant. This is a trespassing to the property diverting the entire lines of the premises causing destruction to the property is improper and illegal. On hearing the case, CGRF (Central Region) issued order dated 17-03-2022, stating to rearrange the existing LT lines and the original alignment. Aggrieved by the order of the Forum, the appellant filed the appeal petition to the Authority and the decision is taken as follows: (1) The act of respondent is proper. (2) The respondent shall re-arrange the existing LT lines in such a way that all conductors are to be placed at the same side of the cross arm (northern side) for more convenience to the appellant by maintaining the statutory clearance from the building. (3) The Licensee has to device a proper mechanism to ensure that the officials strictly adhere to the regulations of Kerala Electricity Supply Code, 2014.
P-028-2022- Sri. Moosa. C.V., Kannur-Order 12-08-2022

Download 
Download

The metering equipment at the premises was covered with vegetation. Earth leakage happened due to the vegetation. The leakage was at the appellant’s side of the installation. Sub Engineer visited the site and inspected the premises and found that the meter is showing high reading though there is no consumption in the construction site. On further testing, it is found that this is due to the earth leakage due to the growth of vegetation. This has been informed to the consumer and the cutout fuse was removed and thus, electricity is disconnected. The bill amount usually came less than Rs.300/-. The respondent issued a bill of Rs.30,000/- and given 5 installments to clear the payment. CGRF had issued order stating that the consumer is liable to pay the amount. Aggrieved by the order of the CGRF(N), the appellant field the appeal petition to the Authority and decision is taken as follows: (1) The appellant is liable to pay the amount as per the consumption. (2) The Licensee shall grant 15 numbers of monthly instalments without interest. (3) CGRF, Northern Region order in OP No.38/2021-22 dated 15-02-2022 is modified accordingly.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday4703
mod_vvisit_counterAll5093662