Supervision charges collected from the appellants by KSEB to provide supply to multi-storied buildings – cases containing similar issues – P/288/12, BinduRia Alex – P/312/12, P/319/12 & P/332/12, Jasmine Rajesh – P/320/12 & P/329/12, Chandra hasanK.C., Tv
The complete Electrical works of 11 KV cable laying up to consumer premises from the nearby existing distribution system, erection of indoor Transformer and all the allied HT and LT side works and terminal arrangements including LT metering panel in the High rise building were all done by the appellant themselves, after incurring its material and labour costs and paying the Supervision charges to KSEB. The appellants insists that the material cost and some extraneous costs need not be taken for calculating the 10% Supervision charge by KSEB. The appellants also opposes the collection of cost of RMU as it is a part of the Licensee’s distribution system and other sums such as road cutting charges, PTCC approval amount and miscellaneous costs included in the estimate prepared by KSEB.

Data

Size 293.46 KB
Downloads 1720
Created 2013-07-19 10:47:29

Download

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2433
mod_vvisit_counterAll5532959