P-037-2021- Smt. Saritha C Nair, Alappuzha- Order 21-10-2021 | ||||||||||||
The electric connection was effected on 26-10-2006 for construction purpose with connected load of 5846 watts. The tariff was changed from LT VIF to LT VIIA on 19-01-2018, after the construction works over and functioning as a pharmaceutical premises. The appellant installed solar panels having a capacity of 5 kW on the roof of the building. The complaint pertains to the additional electricity bill for Rs.7,92,331/- issued by the respondent, stating that the CT connection provided to the energy meter was wrong. The wrong connection led to the interchanging of import energy and export energy in the premises. After approaching the officials of the Licensee for the reconsideration of the additional bill, the appellant filed a petition in CGRF, Central Region and the Forum in its order dismissed the petition due to lack of merits. The appellant filed this Appeal Petition before this Authority. The appeal petition filed by the appellant is dismissed. The order of CGRF Central Region, Ernakulam vide OP No: 84/2020-21 dated 24-04-2021 is upheld. |
|
|||||||||||
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 3801 | |
All | 5571941 |
P/063/2024, Sri. Rajendran .K |
03-01-2025 |
P/064/2024, Sri. Joe.I. Mangaly |
03-01-2025 |
P/082/2024, ശ്രീ.റിയാസ്.ഇ.ആർ |
03-01-2025 |
P/070/2024, ശ്രീ.സ്മിനോജ്.എം.എസ് |
03-01-2025 |
P/069/2024, ശ്രീ.അബ്ദുൾ കരിം സഹറുദ്ദീൻ P.M. |
03-01-2025 |
P/068/2024, ശ്രീമതി.സുകുമാരി.പി |
03-01-2025 |
P/065/2024, ശ്രീമതി. ജോസ്ന കെ.ജെ |
03-01-2025 |
RP/08/2024, Sri. Sunil Thomas |
04-12-2024 |
P/067/2024, Sri. Arun. C |
04-12-2024 |
P/066/2024, Sri. Shajan . N.P |
04-12-2024 |