KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Overview | Search Downloads | Submit file | Up |
Category: Orders | ||
Orders | Files: 1290 | |
Orders of Kerala Electricity Ombudsman in pdf format |
The consumer was provided with electric connection to his newly built building and KSEB allotted non- domestic tariff to the premise treating it as used for a Tuition Centre. The consumer wants the tariff as it was meant for a domestic purpose. The consumer did not pay the bills as he is aggrieved over the tariff allotted and requested for the disconnection of his service connection. The KSEB dismantled the connection and took steps to recover the arrears pending through revenue recovery. Aggrieved by this, this petition was filed. |
Meter showing energy consumption at higher rate. Meter faulty confirmed on test done by KSEB. Dispute cost of damaged old meter- Review-P/223/2011-Sri. N Vasavan-Thevara. |
|
The CGRF has ordered to refund the cost of meter collected from the consumer. The request to refund the cost of broken meter was disallowed by this Authority as he has sought such a relief but failed to put forward any valid contention for the same in the Appeal petition. Aggrieved by the order the consumer filed a review petition. It is stated that since the CGRF has accepted the request and ordered his demand, he refrained from further arguments before EO, even though the relief was sought in the Appeal Petition. |
The consumer has remitted the estimated amount for constructing a separate feeder from the Sub-station by laying 3 x 300 sq.mm cable and accessories for meeting a power demand of around 3000 KVA, to his Multi storied Flat complex under OYEC scheme. The dispute arose when KSEB accorded sanction to a 2nd applicant for giving power from the same Cable laid for the appellant. After giving power to the appellant, the Cable had surplus capacity and the next applicant, with a Power demand for above 1000 KVA, was required to pay less, for tapping power from the cable. The 2nd entrant was thus benefitted. The appellant argues that he needs power for his second stage expansion project. The consumer demands the ownership of the service line constructed and the Cable laid on collecting the estimated cost from him under OYEC scheme. |
KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488
Send an email to info@keralaeo.org
Today | 6403 | |
All | 5516638 |
RP/08/2024, Sri. Sunil Thomas |
04-12-2024 |
P/067/2024, Sri. Arun. C |
04-12-2024 |
P/066/2024, Sri. Shajan . N.P |
04-12-2024 |
P/062/2024, ശ്രീ. മുഹമ്മദ് ഇബ്രാഹിം |
04-12-2024 |
P/061/2024, Sri. Mamathukutty |
04-12-2024 |
P/060/2024, ശ്രീമതി. ചന്ദ്രലേഖ & ശ്രീ .വി.എൻ ശശീന്ദ്രൻ |
04-12-2024 |
P/059/2024, Sri. M. Mohammed Haji |
04-12-2024 |
P/058/2024, Shri.P.N.Krishnadas |
04-12-2024 |
P/057/2024, ശ്രീമതി .നബീസ അമ്പലവൻ |
04-12-2024 |
P/056/2024, ശ്രീമതി. അജിത.കെ.വി |
04-12-2024 |