Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Ascending]
Orders Files: 1290
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
Initial Tariff fixation – consumer complaints that he was billed under wrong tariff of Non domestic instead of domestic– Appeal Petition No. P/216/2011 – K. Sreedharan Pillai, Venjaranmoodu, Thiruvanathapuram.

Download 
Download

The consumer was provided with electric connection to his newly built building and KSEB allotted non- domestic tariff to the premise treating it as used for a Tuition Centre. The consumer wants the tariff as it was meant for a domestic purpose. The consumer did not pay the bills as he is aggrieved over the tariff allotted and requested for the disconnection of his service connection. The KSEB dismantled the connection and took steps to recover the arrears pending through revenue recovery. Aggrieved by this, this petition was filed.
Meter showing energy consumption at higher rate. Meter faulty confirmed on test done by KSEB. Dispute cost of damaged old meter- Review-P/223/2011-Sri. N Vasavan-Thevara.

Download 
Download

The CGRF has ordered to refund the cost of meter collected from the consumer. The request to refund the cost of broken meter was disallowed by this Authority as he has sought such a relief but failed to put forward any valid contention for the same in the Appeal petition. Aggrieved by the order the consumer filed a review petition. It is stated that since the CGRF has accepted the request and ordered his demand, he refrained from further arguments before EO, even though the relief was sought in the Appeal Petition.
The consumer demands the ownership of the service line constructed and the Cable laid on collecting the estimated cost from him. The same Cable used for providing power to the near by applicant at reduced estimate cost is the cause of dispute. Case No. P/

Download 
Download

The consumer has remitted the estimated amount for constructing a separate feeder from the Sub-station by laying 3 x 300 sq.mm cable and accessories for meeting a power demand of around 3000 KVA, to his Multi storied Flat complex under OYEC scheme. The dispute arose when KSEB accorded sanction to a 2nd applicant for giving power from the same Cable laid for the appellant. After giving power to the appellant, the Cable had surplus capacity and the next applicant, with a Power demand for above 1000 KVA, was required to pay less, for tapping power from the cable. The 2nd entrant was thus benefitted. The appellant argues that he needs power for his second stage expansion project. The consumer demands the ownership of the service line constructed and the Cable laid on collecting the estimated cost from him under OYEC scheme.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday6403
mod_vvisit_counterAll5516638