Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1297
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/016/2018 - Sri Ayyappan Nair.C.K.,, Thiruvananthapuram

Download 
Download

The appellant has filed the appeal petition, being aggrieved at the inaction of KSEBL to shift the transformer erected in front of his property situated under Electrical Section, Parassala in Thiruvananthapuram District. The appellant alleges that the said transformer was installed without informing him. The appellant owns about 12¼ cents of land and due to the installation of transformer, he finds difficulty to construct a house in his property because it will cause inconvenience to enter the property. Though the appellant had approached the ministers and various officers of KSEBL for shifting the transformer, his grievance is not yet settled. Since no proper action was taken on his petitions, the appellant has filed petition before the CGRF, Kottarakkara vide Petition No. OP No. 558/2017 and the CGRF has dismissed it by order dated 14-02-2018, due to lack of merit. Still aggrieved by the said order, the appellant has filed the Appeal Petition, before this Authority. In view of the above discussions, the respondent is directed to consider shifting of the transformer in a convenient location at the time of widening the road, if technically feasible. If the widening work is delayed more, the shifting shall be arranged under deposit work, if technically feasible and a convenient location than the present. The order of CGRF, Kottarakkara vide Petition No. OP 558/2017 dated 14-02-2018 is set aside. Having concluded and decided as above, it is ordered accordingly. No order on costs.
P/010/2018 - Smt. M. Thanuja, Alappuzha.

Download 
Download

The Appellant Smt. M. Thanuja is running an ice factory under Electrical Section, Cheppad bearing Consumer No.1155307025542 in industrial tariff (LT IVA) with connected load of 59.281 KW having a contract demand of 65.868 kVA with ToD meter facility. While so, on 19-07-2017, the APTS of KSEBL conducted an inspection in the premises and found that the energy used in one phase (out of 3 phases) was not recording in the meter. Accordingly, the appellant was served with a short assessment bill, for the non functioning of CT in B phase from 26-11-2016 to 21-07-2017, so as to recover the unrecorded portion of energy, for Rs. 3,34,771/-. The appellant filed objection before the Assessing officer, the Asst. Engineer, against the said assessment. Being not satisfied with the decision of the Assistant Engineer, the consumer approached the CGRF, Central, Ernakulam, with Petition No. 55/2017-18 and the Forum disposed of the petition on 11-01-2018 upholding the decision of the respondent. The APTS, Alappuzha has further conducted another inspection in the premises of the appellant on 11-09-.2017 and a short assessment bill of Rs. 1,32,156/- was issued to the appellant on 16-10-2017 as per Section 152 and 134 (1) of Kerala Electricity Supply Code, 2014, Aggrieved by this, the consumer filed O.P. No.78/2017-18 before the Consumer Grievance Redressal Forum and the decision of the Forum is still pending. Aggrieved by the decision in OP No. 55/2017-18, the appellant has submitted the Appeal petition before this Forum. From the findings and conclusions arrived at as detailed above, I decide to set aside the short assessment bills amounting to Rs. 3,34,771/- and for Rs. 1,32,156/- issued to the appellant. The respondent is directed to revise the bills for the consumption for the period from 26-11-2016 to 23-09-2017 excluding 14 days considering the loss as 31.8% instead of 33.33% and issue the revised bill to the consumer within fifteen days. The appellant is also eligible for installments, if requested for, and the respondent shall issue the same. The consumer shall pay the whole amount or the 1st installment within 30 days of the revised bill date. The subsequent installments will bear interest from 30th day of the bill issued to the day of payment. No interest or surcharge is payable by the consumer for the Petition and Appeal pending period before the CGRF and this Authority up to 30th day of the revised bill date. Having concluded and decided as above it is ordered accordingly. The Appeal Petition filed by the Consumer is allowed to the extent as ordered above and stands disposed of as such. The order of CGRF in 55/2017-18 dated 11-01-2018 and order in OP No.78/2017-18 dated 17-03-2018 are set aside. No order on costs.
P/019/2018 - Sri. Abdul Gafoor B.P.. Kannur

Download 
Download

The appellant is an industrial consumer bearing consumer 12205 under the tariff LT IV (A) of Electrical Section, Pappinisseri, running the industrial manufacturing unit namely M/s Fab Wood Industry, Thuruthi, Pappinisseri, having a present connected load of 121645 watts and contract demand 90 kVA. The connected load of electric connection had been enhanced from 40150 watts to 121645 watts with effect from 16-05-2015 resulting replacement of CT with ratio100/5 to 200/5. While so, on 25-10-2017, the factory premise was inspected by the APTS of KSEB and detected wrong application of Multiplication Factor (MF) of 20, instead of actual 40, for converting the meter readings into true energy consumption. The CT’s at the time of the inspection in the premise of the consumer was tested at the meter testing laboratory and the ratio of each CT was confirmed as having 200/5 i.e. 40. The consumer was issued a short assessment bill of Rs. 12,33,436 /- dated 31-10-2017 towards the cost of ‘energy loss’ occurred to KSEB due to mistake in the MF. Upon receiving short assessment bill for Rs. 12,33,436 /-, the consumer approached and filed a petition before CGRF, Kozhikode on 21-11-2017 vide OP No. 156/2017-18. The Forum issued an order on 08-03-2018 to revise the short assessment bill by reducing the period from 29 months to 24 months from 10/2015 to 09/2017 and giving 15 days' time for remittance as per the Regulation 152 of Kerala Electricity Supply Code 2014. The Forum also granted 12 numbers installments for the revised short assessment bill, if the appellant made a request for the same. Aggrieved by the said order, the Appellant has filed the Appeal Petition, before this Authority. From the analysis done above and the findings and conclusions arrived at, I do not find any merit in the Appeal Petition filed. The appellant has consumed energy and due to some omission on the side of the respondent, the multiplication factor was wrongly applied as 20 instead of 40. The site mahazar prepared during APTS inspection has noted down the anomaly detected and copy of the site mahazar was received by the Manager of the Firm. The appellant is also eligible for 24 installments, if requested for, and the respondent shall issue the same. The consumer shall pay the whole amount or the 1st installment within 30 days of this order. The subsequent installments will bear interest from 30th day of this order to the day of payment. No interest or surcharge is payable by the consumer for the Appeal pending period before this Forum and up to 30th day of this order. Having concluded and decided as above, it is ordered accordingly. The order dated 08-03-2018 of CGRF in OP No.156/2017-18 is upheld. No order on costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday1578
mod_vvisit_counterAll5593993