Downloads
Overview Search Downloads Submit file Up
Category: Orders
Order by: Default | Name | Date | Hits | [Descending]
Orders Files: 1297
Orders of Kerala Electricity Ombudsman  in pdf format
Files:
P/036/2019 - Sri. Narayanan K., Ernakulam

Download 
Download

The appellant represents M/s Indus Towers Ltd., a company providing passive infra structure service to telecommunication providers. The appellant is a 3 phase LT VI F consumer bearing number 18918 under Electrical Section, Thodupuzha No. II, with a connected load of 22 kW. The appellant is paying the current charges regularly without any dues or delay. As per the observations of the Regional Audit Officer, a short assessment bill amounting to Rs. 2,46,206/- due to meter faulty period from 07/2014 to 06/2016 has been issued to the consumer on 15-09-2018. An objection against the demand was filed before the Assistant Engineer on 25-09-2018. He rejected the petition without quoting any valid reason or regulations and directed the appellant to remit the short assessed amount, vide the letter dated 15-10-2018. Against the short assessment bill, the appellant had approached the CGRF, Ernakulam by filing a petition No. OP No. 74/2018-19. The Forum disposed of the petition by directing the respondent to revise the bill on the basis of the average of three billing cycles after meter replacement as per regulation 125 (2) of Supply Code 2014, vide order dated 30-03-2019. Aggrieved against this, the appellant has submitted this appeal petition before this Authority. From the conclusions arrived at as detailed above, I decide to quash the short assessment bill amounting to Rs. 246206/- issued to the appellant. Having concluded and decided as above it is ordered accordingly. The Appeal Petition filed by the appellant is allowed as ordered and stands disposed of as such. The order of CGRF in OP No. 74/2018-19 dated 30-03-2019 is set aside. No order on costs.
P/037/2019 - Sri. Narayanan K., Ernakulam

Download 
Download

The appellant represents M/s Indus Towers Ltd., a company providing passive infra structure service to telecommunication providers. The appellant is a 3 phase LT VI F consumer bearing number 23866 under Electrical Section No.2, Thodupuzha, with a connected load of 16260 watts. A short assessment bill amounting to Rs. 17305/- was issued to the consumer on recording of below normal consumption for the period from 10/2015 to 12/2015. An objection against the demand was filed before the Assistant Engineer on 25-09--2018. He rejected the petition without quoting any valid reason or regulations and directed the appellant to remit the short assessed amount vide letter dated 15-10-2018. Against the short assessment bill, the appellant had approached the CGRF, Ernakulam by filing a petition No. OP No. 72/2018-19 dated 30-03-2019. The Forum disposed of the petition by quashing the short assessment bill for Rs. 17305/- . The CGRF has not issued an order regarding the refund of the excess amount collected during the faulty meter period. Aggrieved against this, the appellant has submitted this appeal petition before this Authority. From the conclusions arrived at as detailed above, I decide to uphold the decision of CGRF in OP No. 72/2018-19 dated 30-03-2019, in quashing the short assessment bill amounting to Rs. 17305/- issued to the appellant. The average consumption for 2534 units taken for billing from 01/2016 to 11/2016 is a bogus figure (not an average figure) and which could not be explained by the respondent. The disputed period 10/2015, 11/2015 and 12/2015 is not taken for calculating the average consumption from 01/2016 to 11/2016 and it is decided to take the average consumption from 07/2015, 08/2015 and 09/2015 (2383 units) for calculating average consumption and the respondent is directed to revise the bills for the consumption period of 01/2016 to 11/2016 as stated above. The excess amount collected shall be refunded by adjusting it in consumer’s future bills. Having concluded and decided as above it is ordered accordingly. The Appeal Petition filed by the appellant is allowed as ordered and stands disposed of as such. No order on costs.
P/029/2019 - Sri. Mathew George, Ernakulam

Download 
Download

The appellant having consumer number 6003 is a domestic consumer under Electrical Section, Kaloor. The appellant lodged complaint before the CGRF, Ernakulam requesting to refund the excess charges of Rs. 7,142/- levied and the cost of electricity meter charged for Rs. 4,639/- by the respondent. The CGRF had disposed the petition vide order no. OP No. 101/2018-19 dated 29-03-2019. Not satisfied with decision taken by the CGRF, the appellant has submitted this Appeal petition before this Authority on 26/04/2019. From the findings and conclusions arrived at as detailed above, I decide as follows. The amount of Rs.4639/- realized from the appellant for changing the defective energy meter is quashed. The respondent shall refund/ adjust the amount within a period of 30 days from the date of receipt of this order. The order of CGRF in OP No. 101/2018-19 dated 29-03-2019 is modified to this extent. The Appeal Petition filed by the appellant is allowed and stands disposed of as such. Having concluded and decided as above it is ordered accordingly. No order on costs.

Contact Us

KERALA ELECTRICITY OMBUDSMAN
D.H. Road & Foreshore Road Junction,
Near Gandhi Square,
Ernakulam, Kerala-682 016
Ph: 0484 2346488, Mob: 8714356488

Any Queries?

Send an email to info@keralaeo.org

Do you Know?

Consumers should submit  petitions to CGRF first before appealing Ombudsman.

Visitors Counter

mod_vvisit_counterToday2371
mod_vvisit_counterAll5591394