The appellant Shri. Mohammed M.P is a consumer of the licensee under their Section Electrical section, Balusserry with consumer number 1166138041578. The three phase service connection under the tariff LT.7A with connected load 39.928 Kw was connected on 16/01/2018. The power is availed for the working of a Gold and Jewellery shop named as ‘M/s. Diya Gold and Diamonds’. Anti Power Theft Squad (APTS) conducted an inspection on 09/11/2023 and found that B phase current was recorded zero by the meter. This is only because of the B phase terminal of ‘CT’ is not connected to the meter terminal. The meter was recorded 2/3rd of the actual consumption and the fault occurred since 06/03/20218 and the same was rectified on 27/11/2023. After the rectification the meter started recording the actual consumption. The site mahazar was prepared and a copy was landed over to the representative of the consumer. The licensee was prepared the bill for the short assessment for Rs. 11,19,440/- and send as demand notice. The appellant filed the petition to CGRF and CGRF has ordered to revise the short assessment calculating the average consumption before and after the rectification. Accordingly the short assessment has been revised to Rs. 6,35,437/-. The CGRF ordered that the appellant is liable to pay the amount as per the revised short assessment bill. Aggrieved by the decision of CGRF, this appeal petition was filed to this Authority. |
|
Data
|
Size |
168.74 KB |
Downloads |
742 |
Created |
2024-10-03 09:19:02 |
|
|