The appelant Shri.Moideen Haji is the Consumer of the Licensee (KSEBL) under their electrical section Puthenathani having consumer number 1165711041204 under the tariff LT.VI.G. The power is availed for the functioning of a private hospital named ‘Trust Medical Centre’, at Randathani, Malappuram. The connected load is 37 Kw in 3 phase connected through a ‘CT’ meter with ‘CT’ ratio 200/5. On 18/01/2023 an, inspection was conducted by AEE and found that CT’s were connected wrongly to the meter. Secondary terminal of Y phase ‘CT’ is connected with the B phase terminal of the meter and B phase of ‘CT’ terminal connected to Y phase terminal of meter. Hence the meter was recording the consumption less than the actual consumption. A parallel meter was connected from 23/01/2023 to 27/01/2023 and found that the meter was recording 40% less than the actual consumption. The short assessment prepared by the licensee and send the demand notice to the appellant for Rs. 5,50,810/-. The appellant filed the petition to CGRF and CGRF issued order dated 15/05/2024, and reduced the amount to Rs.4,19,189/-and the appellant is liable to pay the amount as per the revised demand. Aggrieved by the decision of the CGRF this appeal petition is filed to this Authority. |
|
Data
|
Size |
200.23 KB |
Downloads |
725 |
Created |
2024-10-03 09:02:58 |
|
|